1.Sand particles are made of________________?
A. rock minerals
B. kaolinite
C. illite
D. rock minerals

2.The clay mineral with the largest swelling and shrinkage characteristics is_______________?
A. kaolinite
B. illite
C. montmorillonite
D. kaolinite

3.The rate of an item of work depends on_________________?
A. Specifications of works
B. Specifications of materials
C. Proportion of mortar
D. Specifications of works

4.The main factor to be considered while preparing a detailed estimate, is_________?
A. Quantity of the materials
B. Availability of materials
C. Transportation of materials
D. Quantity of the materials

5.The plinth area of a building not includes_________________?
A. Area of the walls at the floor level
B. Area of cantilevered porch
C. Lift and wall including landing
D. Area of the walls at the floor level

6.While estimating the qualities for the construction of a building, the correct metric unit is________________?
A. Metre for length
B. Cubic metre for area
C. Square metres for volume
D. Metre for length

7.The brick work is not measured in cu m in case of_______________?
A. Half brick wall
B. Reinforced brick work
C. Brick work in arches
D. Half brick wall

8.The cross -sections for a highway is taken at___?
A. 30 metres apart
B. Right angle to the centre line
C. Intermediate points having abrupt change in gradient
D. 30 metres apart

9.A cement concrete road is 1000 m long, 8 m wide and 15 cm thick over the sub-base of 10 cm thick gravel. The box cutting in road crust is?
A. 500 m3
B. 1000 m 3
C. 1500 m3
D. 500 m3

10.If the formation level of a highway has a uniform gradient for a particular length, and the ground is also having a longitudinal slope, the earthwork may be calculated by_____?
A. Mid-section formula
B. Trapezoidal formula
C. Prismoidal formula
D. Mid-section formula

11.Brick walls are measured in sq. m if the thickness of the wall is_______?
A. 10 cm
B. 15 cm
C. 20 cm
D. 10 cm

12.The rate of payment is made for 100 cu m (per % cu m) in case of________?
A. Earth work in excavation
B. Rock cutting
C. Excavation in trenches for foundation
D. Earth work in excavation

13.The following item of earth work is not measured separately ?
A. Setting out of works
B. Site clearance
C. Steps in deep excavation
D. Setting out of works

14.The measurement is made in square metre in case of_______?
A. Cement concrete in foundation
B. R.C.C. structure
C. Hollow concrete block wall
D. Cement concrete in foundation

15.Cost of fittings and their fixing is specified for the following sanitary fittings_______?
A. Water closets
B. Flushing pipes
C. Lavatory basins
D. Water closets

16.For the construction of buildings, the subheads of the estimate are___?
A. Earthwork, Concrete work, Brick work
B. Brickwork, Stone work, Roofing
C. Brickwork Flooring, Wood work, Steel work
D. Earthwork, Concrete work, Brick work

17.The excavation exceeding 1.5 m in width and 10 sq.m in plan area with a depth not exceeding 30 cm, is termed as___________?
A. Excavation
B. Surface dressing
C. Cutting
D. Excavation

18.As per Indian Standard Specifications, the peak discharge for domestic purposes per capita per minute, is taken_____?
A. 1.80 litres for 5 to 10 users
B. 1.20 litres for 15 users
C. 1.35 for 20 users
D. 1.80 litres for 5 to 10 users

19.The expected out turn of cement concrete 1 : 2 : 4 per mason per day is_______?
A. 1.5 m 3
B. 2.5 m3
C. 3.5 m3
D. 1.5 m 3

20.The area is measured correct to the nearest______?
A. 0.01 sqm
B. 0.02 sqm
C. 0.03 sqm
D. 0.01 sqm

21.In long and short wall method of estimation, the length of long wall is the centre to centre distance between the walls and?
A. Half breadth of wall on each side
B. Breadth of the wall
C. One fourth breadth of wall on each side
D. Half breadth of wall on each side

22.Pick up the excavation where measurements are made in square metres for payment ?
A. Ordinary cuttings up to 1 m
B. Surface dressing up to 15 cm depths
C. Surface excavation up to 30 cm depths
D. Ordinary cuttings up to 1 m

23.The trap which is provided to disconnect the house drain from the street sewer is called____?
A. Master trap
B. Intercepting trap
C. Interception manhole
D. Master trap

24.The cost of the earthwork in excavation for the surface drain of cross-section shown in the given figure for a total length of 5 metres @ Rs. 450% cum, is____?
A. Rs. 400
B. Rs. 425
C. Rs. 450
D. Rs. 400

25.The measurement is not made in square metres in case of______?
A. D.P.C. (Damp proof course)
B. Form works
C. Concrete Jeffries
D. D.P.C. (Damp proof course)

26.Due to change in price level, a revised estimate is prepared if the sanctioned estimate exceeds____?
A. 2.00%
B. 2.50%
C. 4.00%
D. 2.00%

27.The expected out turn of 2.5 cm cement concrete floor per mansion per day____?
A. 2.5 sqm
B. 5.0 sqm
C. 7.5 sqm
D. 2.5 sqm

28.While preparing a detailed estimate______?
A. Dimension should be measured correct to 0.01 m
B. Area should be measured correct to 0.01 sqm
C. Volume should be measured correct to 0.01 cum
D. Dimension should be measured correct to 0.01 m

29.The most reliable estimate is____?
A. Detailed estimate
B. Preliminary estimate
C. Plinth area estimate
D. Detailed estimate

30.According to ISI method of measurement, the order of the sequence is_____?
A. Length, breadth, height
B. Breadth, length, height
C. Height, length, breadth
D. Length, breadth, height


Date to Date Current Affairs 2022

PakMCQs.net

Quick Links

GAT Subject



   Computer Science    English Mcqs    Agriculture    

Engineering



   Computer Science    Civil Engineering    

Technical



   Networking    Electronics    Database    

Past Papers



   Model Papers    FPSC Papers