GAT Subject
Engineering
Computer Science Civil Engineering Chemical Engineering Agricultural Engineering Mechanical Engineering Electronics and Communication
8. | Cost-Benefit analysis | |
A. | evaluates the tangible and non-tangible factors | |
B. | compares the cost, with the benefits, of introducing a computer-based system | |
C. | estimates the hardware and software costs | |
D. | All of the above | |