GAT Subject
Engineering
Computer Science Civil Engineering Chemical Engineering Agricultural Engineering Mechanical Engineering Electronics and Communication
31. | The minimum time delay required between the initiation of two successive memory operations is known as | |
A. | memory cycle time | |
B. | memory access time | |
C. | transmission time | |
D. | waiting time | |