GAT Subject
Engineering
Computer Science Civil Engineering Chemical Engineering Agricultural Engineering Mechanical Engineering Electronics and Communication
8. | The cost of the earthwork in excavation for the surface drain of cross-section shown in the given figure for a total length of 5 metres @ Rs. 450% cum, is____? | |
A. | Rs. 400 | |
B. | Rs. 425 | |
C. | Rs. 450 | |
D. | Rs. 500 | |