GAT Subject
Engineering
Computer Science Civil Engineering Chemical Engineering Agricultural Engineering Mechanical Engineering Electronics and Communication
26. | In a Decision tree | |
A. | the root is drawn on the left and is the starting point on the decision sequence | |
B. | the branch, to be followed, depends on the conditions and decisions, to be made | |
C. | the nodes represent the conditions, with the right wise of tree listing the actions to be taken | |
D. | All of the above | |