Basic Maths Data Intensity 4 Multiple Questions and Answers.




1.P can do a work in the same time in which Q and R together can do it. If P and Q work together, the work can be completed in 10 days. R alone needs 50 days to complete the same work. then Q alone can do it in ?
A. 15 days
B. 20 days
C. 25 days
D. 30 days

2.A leak in the bottom of a tank can empty the full tank in 6 hrs. An inlet pipe fills water at the rate of 4 lit. a minute. When the tank is full, the inlet is opened and due to the leak, the tank is empty in 8 hrs. The capacity of the tank in liters is ?
A. 5,750 litres
B. 5,760 litres
C. 6,890 litres
D. None of Above

3.A tap can fill a tank in 32 min. and another can empty it in 16 min. If the tank is already half full and both the tanks are opened together, the tank will be ?
A. 12 min
B. 14 min
C. 16 min
D. 18 min

4.A and B can do a piece of work in 12 days; B and C in 15 days; C and A in 20 days. A alone can do the work in ?
A. 20 days
B. 30 days
C. 40 days
D. 50 days

5.Twelve men can do a work in twenty days while twenty women can finish the same work in sixteen days. Find the ratio between the capacity of a man and a woman.?
A. 3:4
B. 5:4
C. 4:3
D. 5:3

»



Date to Date Current Affairs 2022

PakMCQs.net

Quick Links

GAT Subject



   Computer Science    English Mcqs    Agriculture    

Engineering



   Computer Science    Civil Engineering    

Technical



   Networking    Electronics    Database    

Past Papers



   Model Papers    FPSC Papers