Estimating and Costing-Data Intensity 1 Multiple Questions and Answers.




1.The rate of an item of work depends on_________________?
A. Specifications of works
B. Specifications of materials
C. Proportion of mortar
D. All the above

2.The main factor to be considered while preparing a detailed estimate, is_________?
A. Quantity of the materials
B. Availability of materials
C. Transportation of materials
D. All the above

3.The plinth area of a building not includes_________________?
A. Area of the walls at the floor level
B. Area of cantilevered porch
C. Lift and wall including landing
D. Internal shaft for sanitary installations up to 2 sq m. in area

4.While estimating the qualities for the construction of a building, the correct metric unit is________________?
A. Metre for length
B. Cubic metre for area
C. Square metres for volume
D. Litre for capacity

5.The brick work is not measured in cu m in case of_______________?
A. Half brick wall
B. Reinforced brick work
C. Brick work in arches
D. One or more than one brick wall

»



Date to Date Current Affairs 2022

PakMCQs.net

Quick Links

GAT Subject



   Computer Science    English Mcqs    Agriculture    

Engineering



   Computer Science    Civil Engineering    

Technical



   Networking    Electronics    Database    

Past Papers



   Model Papers    FPSC Papers