16.. Backfilling and compaction of trenches should be carried out in layers of:
A. 150 mm
B. 200 mm
C. 300 mm
D. 450 mm

17. The first reading taken from an instrument position is termed the:
A. foresight
B. datum sight
C. intermediate sight
D. backsight

18. A d.p.c. placed under a stone sill should extend on each side of the sill at least:
A. 75 mm
B. 100 mm
C. 150 mm
D. 200 mm

19. Sand-lime bricks are hardened by:
A. steaming in an autoclave
B. firing in a continuous kiln
C. the addition of Portland cement
D. continuous spraying with water

20. Before a foundation may be concreted, the natural foundation must be inspected by the:
A. clerk of works
B. factory inspector
C. safety officer
D. building control officer

«»



Date to Date Current Affairs 2022

PakMCQs.net

Quick Links

GAT Subject



   Computer Science    English Mcqs    Agriculture    

Engineering



   Computer Science    Civil Engineering    

Technical



   Networking    Electronics    Database    

Past Papers



   Model Papers    FPSC Papers