Time and Work - Data Intensity 1 Multiple Questions and Answers.




36.P can do a work in 24 days. Q can do the same work in 9 days and R can do the same in 12 days. Q and R start the work and leave after 3 days. P finishes the remaining work in___days.
A. 10
B. 9
C. 11
D. 12

37.Kamal will complete work in 20 days. If Suresh is 25% more efficient than Kamal, he can complete the work in___days.
A. 14
B. 16
C. 15
D. 11

38.A completes 80% of a work in 20 days. Then B also joins and A and B together finish the remaining work in 3 days. How long does it need for B if he alone completes the work?
A. 37 ½ days
B. 22 days
C. 31 days
D. 22 days

39.12 buckets of water fill a tank when the capacity of each bucket is 13.5 litres. How many buckets will be needed to fill the same tank, if the capacity of each bucket is 9 litres?
A. 14
B. 15
C. 16
D. 18

40.A leak in the lower portion of a tank can empty the full tank in 9 hrs. An inlet pipe fills water at the rtae of 10 lit. a minute. When the tank is full, the inlet is opened and due to leak, the tank is empty in 16 hrs. How many litres does the cistern hold ?
A. 12,342 litres.
B. 12,444 litres
C. 12,566 litres.
D. None of thes

«»



Date to Date Current Affairs 2022

PakMCQs.net

Quick Links

GAT Subject



   Computer Science    English Mcqs    Agriculture    

Engineering



   Computer Science    Civil Engineering    

Technical



   Networking    Electronics    Database    

Past Papers



   Model Papers    FPSC Papers