System Analysis and Design - Section 1 Multiple Questions and Answers.




26.A branch office, location or other data processing centres, where a newly developed system is used under normal operating conditions for several months, to test it, is called
A. beta test data
B. alpha test data
C. string test data
D. system test data

27.Elapsed time, between initiating a query and receiving a response is called
A. response time
B. waiting time
C. processing time
D. Turnaround time

28.During the system study, the executive vice-president and the other managers exercise their responsibility of
A. planning
B. controlling
C. directing
D. organizing

29.Which of the following is (are) not a tool for Application Prototyping?
A. Application generators
B. third generation language
C. screen generators
D. report generators

30.The set of. instructions for how to tie a bow is an example of the _____Structure.
A. Control
B. Repetition
C. Selection
D. Sequence

«»



Date to Date Current Affairs 2022

PakMCQs.net

Quick Links

GAT Subject



   Computer Science    English Mcqs    Agriculture    

Engineering



   Computer Science    Civil Engineering    

Technical



   Networking    Electronics    Database    

Past Papers



   Model Papers    FPSC Papers