RCC Structures Design-Data Intensity 3 Multiple Questions and Answers.
Exercise Questions ::
RCC Structures Design
Published by:Michael Daani
2. | In a pre-stressed member it is advisable to use? |
| |
| A. | Low strength concrete only |
| B. | High strength concrete only |
| C. | Low strength concrete but high tensile steel |
| D. | High strength concrete and high tensile steel |
|
|
Published by:Michael Daani
3. | Steel bars are generally connected together to get greater length than the standard length by providing? |
| |
| A. | Straight bar splice |
| B. | Hooked splice |
| C. | Dowel splice |
| D. | All the above |
|
|
Published by:Michael Daani
4. | If the ratio of the span to the overall depth does not exceed 10, the stiffness of the beam will ordinarily be satisfactory in case of a? |
| |
| A. | Simply supported beam |
| B. | Continuous beam |
| C. | Cantilever beam |
| D. | None of these |
|
|
Published by:Michael Daani
Published by:Michael Daani
»