Estimating and Costing-Data Intensity 3 Multiple Questions and Answers.




6.Pick up the excavation where measurements are made in square metres for payment ?
A. Ordinary cuttings up to 1 m
B. Surface dressing up to 15 cm depths
C. Surface excavation up to 30 cm depths
D. Both B. and C.

7.The trap which is provided to disconnect the house drain from the street sewer is called____?
A. Master trap
B. Intercepting trap
C. Interception manhole
D. All the above

8.The cost of the earthwork in excavation for the surface drain of cross-section shown in the given figure for a total length of 5 metres @ Rs. 450% cum, is____?
A. Rs. 400
B. Rs. 425
C. Rs. 450
D. Rs. 500

9.The measurement is not made in square metres in case of______?
A. D.P.C. (Damp proof course)
B. Form works
C. Concrete Jeffries
D. R.C. Chhajja

«



Date to Date Current Affairs 2022

PakMCQs.net

Quick Links

GAT Subject



   Computer Science    English Mcqs    Agriculture    

Engineering



   Computer Science    Civil Engineering    

Technical



   Networking    Electronics    Database    

Past Papers



   Model Papers    FPSC Papers