Estimating and Costing-Data Intensity 2 Multiple Questions and Answers.




1.A cement concrete road is 1000 m long, 8 m wide and 15 cm thick over the sub-base of 10 cm thick gravel. The box cutting in road crust is?
A. 500 m3
B. 1000 m 3
C. 1500 m3
D. 2000 m3

2.If the formation level of a highway has a uniform gradient for a particular length, and the ground is also having a longitudinal slope, the earthwork may be calculated by_____?
A. Mid-section formula
B. Trapezoidal formula
C. Prismoidal formula
D. All the above

3.Brick walls are measured in sq. m if the thickness of the wall is_______?
A. 10 cm
B. 15 cm
C. 20 cm
D. None of these

4.The rate of payment is made for 100 cu m (per % cu m) in case of________?
A. Earth work in excavation
B. Rock cutting
C. Excavation in trenches for foundation
D. All the above

5.The following item of earth work is not measured separately ?
A. Setting out of works
B. Site clearance
C. Steps in deep excavation
D. All the above

»



Date to Date Current Affairs 2022

PakMCQs.net

Quick Links

GAT Subject



   Computer Science    English Mcqs    Agriculture    

Engineering



   Computer Science    Civil Engineering    

Technical



   Networking    Electronics    Database    

Past Papers



   Model Papers    FPSC Papers