Estimating and Costing-Data Intensity 3 Multiple Questions and Answers.
Exercise Questions ::
Estimating and Costing
6. Pick up the excavation where measurements are made in square metres for payment ?
A. Ordinary cuttings up to 1 m B. Surface dressing up to 15 cm depths C. Surface excavation up to 30 cm depths D. Both B. and C.
View Answer
Discuss forum
Workplace
Report
Published by:Michael Daani
7. The trap which is provided to disconnect the house drain from the street sewer is called____?
A. Master trap B. Intercepting trap C. Interception manhole D. All the above
View Answer
Discuss forum
Workplace
Report
Published by:Michael Daani
8. The cost of the earthwork in excavation for the surface drain of cross-section shown in the given figure for a total length of 5 metres @ Rs. 450% cum, is____?
A. Rs. 400 B. Rs. 425 C. Rs. 450 D. Rs. 500
View Answer
Discuss forum
Workplace
Report
Published by:Michael Daani
Published by:Michael Daani
«