Estimating and Costing-Data Intensity 1 Multiple Questions and Answers.
Exercise Questions ::
Estimating and Costing
1. | The rate of an item of work depends on_________________? |
| |
| A. | Specifications of works |
| B. | Specifications of materials |
| C. | Proportion of mortar |
| D. | All the above |
|
|
Published by:Michael Daani
2. | The main factor to be considered while preparing a detailed estimate, is_________? |
| |
| A. | Quantity of the materials |
| B. | Availability of materials |
| C. | Transportation of materials |
| D. | All the above |
|
|
Published by:Michael Daani
3. | The plinth area of a building not includes_________________? |
| |
| A. | Area of the walls at the floor level |
| B. | Area of cantilevered porch |
| C. | Lift and wall including landing |
| D. | Internal shaft for sanitary installations up to 2 sq m. in area |
|
|
Published by:Michael Daani
4. | While estimating the qualities for the construction of a building, the correct metric unit is________________? |
| |
| A. | Metre for length |
| B. | Cubic metre for area |
| C. | Square metres for volume |
| D. | Litre for capacity |
|
|
Published by:Michael Daani
5. | The brick work is not measured in cu m in case of_______________? |
| |
| A. | Half brick wall |
| B. | Reinforced brick work |
| C. | Brick work in arches |
| D. | One or more than one brick wall |
|
|
Published by:Michael Daani
»