Estimating and Costing-Data Intensity 4 Multiple Questions and Answers.




6.The item of the brick structure measured in sq.m, is______?
A. Reinforced brick work
B. Broken glass coping
C. Brick edging
D. Brick work in arches

7.Anti-siphonage pipe is connected to_____?
A. Main soil pipe
B. Bottom of P trap W.C.
C. Top of P trap W.C.
D. Side of water closet

8.The concrete work for the following part of the building of specified thickness is measured in square metres_____?
A. Root slabs
B. Floors
C. Wall panels
D. All the above

«



Date to Date Current Affairs 2022

PakMCQs.net

Quick Links

GAT Subject



   Computer Science    English Mcqs    Agriculture    

Engineering



   Computer Science    Civil Engineering    

Technical



   Networking    Electronics    Database    

Past Papers



   Model Papers    FPSC Papers